VNA pallet racking

time2011/11/16

The decision to have one or two inspections per year are required is the clients and dates and times will be agreed
when an order is received. Each inspection is carried out to SEMA standards and involves a general visual
inspection of the installation from ground level only. The following specific points are particularly looked for: -
Correct location of beams, including location of beam locks in uprights.
Excessive deflection of beams, due to current or past overloading.
Signs of damage to the installation due to impact by handling or other equipment.
Incorrect loading and positioning of pallets within VNA pallet racking locations.
Use of inappropriate or damaged pallets.
Incorrect loading and positioning of pallets.
Incorrect use of accessories supplied with racking.
Missing or loose fixing down bolts.
A written report together with a layout drawing making any appropriate recommendations will be sent to
you following each inspection. However, if an unsatisfactory situation, which we consider dangerous, due
to misuse or damage, is observed during an inspection, it will be pointed out to you or your representative
on site. Any requirement for remedial work resulting from an inspection will be included in the report.