shelving mezzanine production operations requirements

time2011/12/30

shelving mezzanine production operations requirements
shelving mezzanine access and operation to ensure clearance. Clear height of not less than the general prevailing 1.8M, shelving mezzanine platform four weeks should be generally set up protective railing, railing height is 1M. When the platform height is greater than 2M, there should be set up under the protective railing height of 100-150mm of the skirting board. shelving mezzanine platform should be set for up and down movement of the ladder, the ladder of width not less than 600mm.