pallet racking to ensure passage and clearance operations. pallet racking height of not less than the general prevailing net 1.8M, platform, four weeks generally should be set up protective railing, railing height is 1M. When the platform height is greater than 2M, the still pallet racking protection railing should be set under the height of 100-150mm of the skirting board. Platform should be set for up and down movement of the ladder, the ladder of width not less than 600mm.